Upgrade of Lighting and Power in School
Sector: Education
Services: Electrical Installation • LED
Address: The New Beacon School Sports Centre, Brittains Lane, Sevenoaks, Kent
Oakleaf Electrical were extremely proud to be appointed by our client, the New Beacon School, to design the electrical installation “The Beacon Centre”.
Works commenced in the summer of 2016 and we worked under the control of the main contractor, Baxall Construction.
![New Beacon exterior IMG 1503](https://oakleafelectrical.net/img/main-img/_main256/New-Beacon-exterior_IMG_1503.jpg 256w,
https://oakleafelectrical.net/img/main-img/_main296/New-Beacon-exterior_IMG_1503.jpg 296w,
https://oakleafelectrical.net/img/main-img/_main311/New-Beacon-exterior_IMG_1503.jpg 311w,
https://oakleafelectrical.net/img/main-img/_main350/New-Beacon-exterior_IMG_1503.jpg 350w,
https://oakleafelectrical.net/img/main-img/_main512/New-Beacon-exterior_IMG_1503.jpg 512w,
https://oakleafelectrical.net/img/main-img/_main542/New-Beacon-exterior_IMG_1503.jpg 542w,
https://oakleafelectrical.net/img/main-img/_main576/New-Beacon-exterior_IMG_1503.jpg 576w,
https://oakleafelectrical.net/img/main-img/_main592/New-Beacon-exterior_IMG_1503.jpg 592w,
https://oakleafelectrical.net/img/main-img/_main622/New-Beacon-exterior_IMG_1503.jpg 622w,
https://oakleafelectrical.net/img/main-img/_main686/New-Beacon-exterior_IMG_1503.jpg 686w,
https://oakleafelectrical.net/img/main-img/_main694/New-Beacon-exterior_IMG_1503.jpg 694w,
https://oakleafelectrical.net/img/main-img/_main700/New-Beacon-exterior_IMG_1503.jpg 700w,
https://oakleafelectrical.net/img/main-img/_main704/New-Beacon-exterior_IMG_1503.jpg 704w,
https://oakleafelectrical.net/img/main-img/_main1084/New-Beacon-exterior_IMG_1503.jpg 1084w,
https://oakleafelectrical.net/img/main-img/_main1152/New-Beacon-exterior_IMG_1503.jpg 1152w,
https://oakleafelectrical.net/img/main-img/_main1372/New-Beacon-exterior_IMG_1503.jpg 1372w,
https://oakleafelectrical.net/img/main-img/_main1408/New-Beacon-exterior_IMG_1503.jpg 1408w)
Our challenge was to meet the tight deadline required by the client and to minimise disruption to the school, its staff, pupils, parents and visitors, whilst carrying out the works.
We installed metal containment throughout for lighting and power circuits and sub-main cabling to various distribution boards, within the three-storey building.
Within the plant room, a multi-metered panel board was installed with MCCB protective devices, to each of the distribution boards.
![New Beacon Centre 01](https://oakleafelectrical.net/img/main-img/_main256/New-Beacon-Centre-01.jpg 256w,
https://oakleafelectrical.net/img/main-img/_main296/New-Beacon-Centre-01.jpg 296w,
https://oakleafelectrical.net/img/main-img/_main311/New-Beacon-Centre-01.jpg 311w,
https://oakleafelectrical.net/img/main-img/_main350/New-Beacon-Centre-01.jpg 350w,
https://oakleafelectrical.net/img/main-img/_main512/New-Beacon-Centre-01.jpg 512w,
https://oakleafelectrical.net/img/main-img/_main542/New-Beacon-Centre-01.jpg 542w,
https://oakleafelectrical.net/img/main-img/_main576/New-Beacon-Centre-01.jpg 576w,
https://oakleafelectrical.net/img/main-img/_main592/New-Beacon-Centre-01.jpg 592w,
https://oakleafelectrical.net/img/main-img/_main622/New-Beacon-Centre-01.jpg 622w,
https://oakleafelectrical.net/img/main-img/_main686/New-Beacon-Centre-01.jpg 686w,
https://oakleafelectrical.net/img/main-img/_main694/New-Beacon-Centre-01.jpg 694w,
https://oakleafelectrical.net/img/main-img/_main700/New-Beacon-Centre-01.jpg 700w,
https://oakleafelectrical.net/img/main-img/_main704/New-Beacon-Centre-01.jpg 704w,
https://oakleafelectrical.net/img/main-img/_main1084/New-Beacon-Centre-01.jpg 1084w,
https://oakleafelectrical.net/img/main-img/_main1152/New-Beacon-Centre-01.jpg 1152w,
https://oakleafelectrical.net/img/main-img/_main1372/New-Beacon-Centre-01.jpg 1372w,
https://oakleafelectrical.net/img/main-img/_main1408/New-Beacon-Centre-01.jpg 1408w)
Lighting was all controlled by motion sensors, with daylight dimming.
In the main hall we worked very closely with the school’s own Theatre company, as this area was to be used, not only for sports, but also for Theatrical events by the school. Dimming racks were installed, as well as AV cabling. Emergency lighting was installed throughout the new building.
The client was extremely pleased with the end result, which looked outstanding.
The project value was in the region of £150k and completed over a six month period in 2017.
Although the management has changed at the New Beacon School, we still work very closely with the new management team.
Latest case studies
![Harmony Hse 001 hires](https://oakleafelectrical.net/img/main-img/_main212/Harmony_Hse_001_hires.jpg 212w,
https://oakleafelectrical.net/img/main-img/_main256/Harmony_Hse_001_hires.jpg 256w,
https://oakleafelectrical.net/img/main-img/_main272/Harmony_Hse_001_hires.jpg 272w,
https://oakleafelectrical.net/img/main-img/_main296/Harmony_Hse_001_hires.jpg 296w,
https://oakleafelectrical.net/img/main-img/_main311/Harmony_Hse_001_hires.jpg 311w,
https://oakleafelectrical.net/img/main-img/_main336/Harmony_Hse_001_hires.jpg 336w,
https://oakleafelectrical.net/img/main-img/_main350/Harmony_Hse_001_hires.jpg 350w,
https://oakleafelectrical.net/img/main-img/_main424/Harmony_Hse_001_hires.jpg 424w,
https://oakleafelectrical.net/img/main-img/_main512/Harmony_Hse_001_hires.jpg 512w,
https://oakleafelectrical.net/img/main-img/_main544/Harmony_Hse_001_hires.jpg 544w,
https://oakleafelectrical.net/img/main-img/_main576/Harmony_Hse_001_hires.jpg 576w,
https://oakleafelectrical.net/img/main-img/_main592/Harmony_Hse_001_hires.jpg 592w,
https://oakleafelectrical.net/img/main-img/_main622/Harmony_Hse_001_hires.jpg 622w,
https://oakleafelectrical.net/img/main-img/_main672/Harmony_Hse_001_hires.jpg 672w,
https://oakleafelectrical.net/img/main-img/_main700/Harmony_Hse_001_hires.jpg 700w,
https://oakleafelectrical.net/img/main-img/_main704/Harmony_Hse_001_hires.jpg 704w,
https://oakleafelectrical.net/img/main-img/_main1152/Harmony_Hse_001_hires.jpg 1152w,
https://oakleafelectrical.net/img/main-img/_main1408/Harmony_Hse_001_hires.jpg 1408w)
Electrical Installation at a Dementia Respite Centre
Health & Police Authorities
Installation • LED
![Maidstone Hospital IMG 2115 rt](https://oakleafelectrical.net/img/main-img/_main212/Maidstone-Hospital_IMG_2115-rt.jpg 212w,
https://oakleafelectrical.net/img/main-img/_main256/Maidstone-Hospital_IMG_2115-rt.jpg 256w,
https://oakleafelectrical.net/img/main-img/_main272/Maidstone-Hospital_IMG_2115-rt.jpg 272w,
https://oakleafelectrical.net/img/main-img/_main296/Maidstone-Hospital_IMG_2115-rt.jpg 296w,
https://oakleafelectrical.net/img/main-img/_main311/Maidstone-Hospital_IMG_2115-rt.jpg 311w,
https://oakleafelectrical.net/img/main-img/_main336/Maidstone-Hospital_IMG_2115-rt.jpg 336w,
https://oakleafelectrical.net/img/main-img/_main350/Maidstone-Hospital_IMG_2115-rt.jpg 350w,
https://oakleafelectrical.net/img/main-img/_main424/Maidstone-Hospital_IMG_2115-rt.jpg 424w,
https://oakleafelectrical.net/img/main-img/_main512/Maidstone-Hospital_IMG_2115-rt.jpg 512w,
https://oakleafelectrical.net/img/main-img/_main544/Maidstone-Hospital_IMG_2115-rt.jpg 544w,
https://oakleafelectrical.net/img/main-img/_main576/Maidstone-Hospital_IMG_2115-rt.jpg 576w,
https://oakleafelectrical.net/img/main-img/_main592/Maidstone-Hospital_IMG_2115-rt.jpg 592w,
https://oakleafelectrical.net/img/main-img/_main622/Maidstone-Hospital_IMG_2115-rt.jpg 622w,
https://oakleafelectrical.net/img/main-img/_main672/Maidstone-Hospital_IMG_2115-rt.jpg 672w,
https://oakleafelectrical.net/img/main-img/_main700/Maidstone-Hospital_IMG_2115-rt.jpg 700w,
https://oakleafelectrical.net/img/main-img/_main704/Maidstone-Hospital_IMG_2115-rt.jpg 704w,
https://oakleafelectrical.net/img/main-img/_main1152/Maidstone-Hospital_IMG_2115-rt.jpg 1152w,
https://oakleafelectrical.net/img/main-img/_main1408/Maidstone-Hospital_IMG_2115-rt.jpg 1408w)
Replacement of Distribution Boards in Hospital
Health & Police Authorities
Installation
![Kemnal College IMG 3476](https://oakleafelectrical.net/img/main-img/_main212/Kemnal-College_IMG_3476.jpg 212w,
https://oakleafelectrical.net/img/main-img/_main256/Kemnal-College_IMG_3476.jpg 256w,
https://oakleafelectrical.net/img/main-img/_main272/Kemnal-College_IMG_3476.jpg 272w,
https://oakleafelectrical.net/img/main-img/_main296/Kemnal-College_IMG_3476.jpg 296w,
https://oakleafelectrical.net/img/main-img/_main311/Kemnal-College_IMG_3476.jpg 311w,
https://oakleafelectrical.net/img/main-img/_main336/Kemnal-College_IMG_3476.jpg 336w,
https://oakleafelectrical.net/img/main-img/_main350/Kemnal-College_IMG_3476.jpg 350w,
https://oakleafelectrical.net/img/main-img/_main424/Kemnal-College_IMG_3476.jpg 424w,
https://oakleafelectrical.net/img/main-img/_main512/Kemnal-College_IMG_3476.jpg 512w,
https://oakleafelectrical.net/img/main-img/_main544/Kemnal-College_IMG_3476.jpg 544w,
https://oakleafelectrical.net/img/main-img/_main576/Kemnal-College_IMG_3476.jpg 576w,
https://oakleafelectrical.net/img/main-img/_main592/Kemnal-College_IMG_3476.jpg 592w,
https://oakleafelectrical.net/img/main-img/_main622/Kemnal-College_IMG_3476.jpg 622w,
https://oakleafelectrical.net/img/main-img/_main672/Kemnal-College_IMG_3476.jpg 672w,
https://oakleafelectrical.net/img/main-img/_main700/Kemnal-College_IMG_3476.jpg 700w,
https://oakleafelectrical.net/img/main-img/_main704/Kemnal-College_IMG_3476.jpg 704w,
https://oakleafelectrical.net/img/main-img/_main1152/Kemnal-College_IMG_3476.jpg 1152w,
https://oakleafelectrical.net/img/main-img/_main1408/Kemnal-College_IMG_3476.jpg 1408w)
Electrical Works in Technology College
Education
Installation
![IPP2261](https://oakleafelectrical.net/img/main-img/_main212/IPP2261.jpg 212w,
https://oakleafelectrical.net/img/main-img/_main256/IPP2261.jpg 256w,
https://oakleafelectrical.net/img/main-img/_main272/IPP2261.jpg 272w,
https://oakleafelectrical.net/img/main-img/_main296/IPP2261.jpg 296w,
https://oakleafelectrical.net/img/main-img/_main311/IPP2261.jpg 311w,
https://oakleafelectrical.net/img/main-img/_main336/IPP2261.jpg 336w,
https://oakleafelectrical.net/img/main-img/_main350/IPP2261.jpg 350w,
https://oakleafelectrical.net/img/main-img/_main424/IPP2261.jpg 424w,
https://oakleafelectrical.net/img/main-img/_main512/IPP2261.jpg 512w,
https://oakleafelectrical.net/img/main-img/_main544/IPP2261.jpg 544w,
https://oakleafelectrical.net/img/main-img/_main576/IPP2261.jpg 576w,
https://oakleafelectrical.net/img/main-img/_main592/IPP2261.jpg 592w,
https://oakleafelectrical.net/img/main-img/_main622/IPP2261.jpg 622w,
https://oakleafelectrical.net/img/main-img/_main672/IPP2261.jpg 672w,
https://oakleafelectrical.net/img/main-img/_main700/IPP2261.jpg 700w,
https://oakleafelectrical.net/img/main-img/_main704/IPP2261.jpg 704w,
https://oakleafelectrical.net/img/main-img/_main1152/IPP2261.jpg 1152w,
https://oakleafelectrical.net/img/main-img/_main1408/IPP2261.jpg 1408w)
Electrical Installation Within Domestic Properties
Building Contractors
Installation • Testing